Tendring Hundred Water Services Limited
Overall Water Quality supplied by Tendring Hundred Water in 2000
A total of 4,711 tests were carried out by Tendring Hundred Water in 2000. Of these tests, 99.89% complied with the Regulations.
Company Information Amount of Water Supplied: 30 Ml/d Consumers Supplied: 145,000 Areas of Supply: Tendring peninsula of Essex Water Composition: 20% from rivers and reservoirs
80% from boreholes and aquifersTreatment Works: 3 Service Reservoirs: 8 Km of Mains: 930 Water Supply Zones: 4 Water Quality in Water Supply Zones, at Treatment Works, and in Service Reservoirs
Water supply zones
- In general, to be wholesome, water must comply with the standards set out in the Regulations. The Company carried out a total of 2,551 tests on samples taken in its four water supply zones. The table below includes only the parameters that breached the standard. All other parameters fully complied with the standards. Parameter meanings can be found at the beginning of this section.
- The last column indicates the number of failures in zones already covered by legally binding undertakings given by the Company to carry out remedial works to overcome the difficulty in meeting the individual standard.
Parameter
Total samples taken
Samples not meeting the standard
Percentage
Number of failures already covered by undertakings
Total coliforms
396
1
0.25
-
Faecal coliforms
396
1
0.25
-
Turbidity
52
1
1.92
-
Nitrite
52
1
1.92
-
Manganese
52
1
1.92
-
Treatment works
All of the Company’s three treatment works complied fully with the relevant standards. Service reservoirs
All of the Company’s eight service reservoirs complied fully with the relevant standards. Company Audit and Inspection
Link to expanded information (web site version)
- The Company was inspected or audited by DWI or its appointed consultants on five occasions in 2000. Where relevant, report summaries are available in the ‘Business and Technical’ section of DWI’s web site under ‘Audit and Inspection’.
Audit or Inspection
Date
Annual assessment of 1999 compliance data
April/May
Audit of plumbosolvency treatment and control programmes of work
November
Audit trails of five samples
November
Follow-up of response to recommendations
December
Inspection of distribution system improvement programme progress
Ongoing
No major deficiencies were identified but a number of recommendations were made Incidents
- No events significantly affecting the quality of drinking water were notified to the Inspectorate by the Company during 2000.
Improvement Programmes
Carried Out by the Company
- No remedial programmes were due for full completion during 2000.
- The distribution system improvement programme, due for completion in 2004, is on-going. The Inspectorate is in discussions with the Company concerning the volume of work required.
Enforcement Action
- No enforcement action needed to be considered for the Company as a result of the Inspectorate’s work during 2000.
[ Previous ] [ Contents ] [ Next ]
| A - Z Index | Business and Technical | Consumer Information | Contacting us |
| DWI Home Page | News | Product Approval | Search our site | Wales |
Drinking Water Inspectorate,
Floor 2/A1, Ashdown House, 123 Victoria Street, London, SW1E 6DE
Telephone : 020 7944 5956 - Facsimile : 020 7944 5969
E-mail: dwi_enquiries@detr.gov.uk
Published 11 July 2001
Return to Publications and Reports Index
Return to Drinking Water Inspectorate Home Page
Department for Environment, Food & Rural Affairs (DEFRA)Home Page
The National Assembly for Wales / Cynulliad Cenedlaethol Cymru Home Page
Web site terms
© Crown copyright 2001