6 Dee Valley Water Plc
| Overall Water Quality supplied by Dee Valley Water
Plc in 2002 |
- A total of 14,071 tests were carried out on samples taken
by Dee Valley Water Plc in 2002.
- Of these tests, 99.86% complied with the Regulations.
|
|
| Company Information |
| Amount of Water Supplied: |
71 Ml/d |
| Consumers Supplied: |
258,500 |
| Areas of Supply: |
Chester, Wrexham, Llangollen and surrounding
areas of Denbighshire and Flintshire. |
| Water Composition: |
96% from rivers and reservoirs |
| |
4% from boreholes and aquifers |
| Treatment Works: |
7 |
| Service Reservoirs: |
31 |
| Km of Mains: |
1,953 |
| Water Supply Zones: |
18 |
|
|
Water Quality at Treatment Works, in Service
Reservoirs and in Water Supply Zones
To be wholesome, water must comply with the standards for the parameters
set out in the Water Supply (Water Quality) Regulations 1989. In 2002,
the Company carried out a total of 14,071 tests on samples taken at
water treatment works, from service reservoirs and in water supply zones
and of these, 99.86% complied with the relevant water quality standards
set down in the Regulations. A list of the parameters, the relevant
standards and their significance can be found at the beginning of this
section.
Water Quality leaving Treatment works
| |
2002 |
2001 |
2000 |
| Number of water
treatment works |
7 |
7 |
8 |
| COLIFORMS |
|
|
|
| Total number of
tests |
1,356 |
1,352 |
1,376 |
| - |
number containing coliforms |
0 |
0 |
1 |
| - |
% containing coliforms
|
0.00% |
0.00% |
0.07% |
| Treatment works
with coliforms detected |
0 |
0 |
1 |
| - |
% of all works with coliforms
detected |
0.00% |
0.00% |
12.50% |
| FAECAL COLIFORMS |
|
|
|
| Total number of
tests |
1,356 |
1,352 |
1,376 |
| - |
number containing faecal coliforms |
0 |
0 |
0 |
| - |
% containing faecal coliforms |
0.00% |
0.00% |
0.00% |
| Treatment works
with faecal coliforms detected |
0 |
0 |
0 |
| - |
% of all works with faecal
coliforms detected |
0.00% |
0.00% |
0.00% |
There were no failures of the coliform and faecal coliform standards
at any of the Company's treatment works in 2002. Differences over the
last three years in the number of treatment works, and in the number
of tests carried out on samples from treatment works, in which coliforms
were detected were not considered significant.
In 2002, 1,103 regulatory samples for Cryptosporidium were taken at
three sites. Very low numbers of oocysts were detected in three samples
from two sites. All results were below the treatment standard and there
were no reported outbreaks of cryptosporidiosis.
Water Quality in Service Reservoirs
| |
2002 |
2001 |
2000 |
| Number of service
reservoirs |
31 |
30 |
31 |
| COLIFORMS |
|
|
|
| Total number of
tests |
1,586 |
1,569 |
1,580 |
| - |
number containing coliforms |
0 |
2 |
2 |
| - |
% containing coliforms
|
0.00% |
0.13% |
0.13% |
| Service reservoirs
with coliforms detected |
0 |
2 |
2 |
| Service reservoirs
with coliforms detected |
0 |
0 |
0 |
| in more than 5%
of tests |
|
|
|
| - |
% of all service reservoirs
with coliforms detected |
0.00% |
0.00% |
0.00% |
| FAECAL COLIFORMS |
|
|
|
| Total number of
tests |
1,586 |
1,569 |
1,580 |
| - |
number containing faecal coliforms |
0 |
1 |
2 |
| - |
% containing faecal coliforms |
0.00% |
0.06% |
0.13% |
| Service reservoirs
with faecal coliforms detected |
0 |
1 |
2 |
| - |
% of all service reservoirs
with faecal coliforms detected |
0.00% |
3.33% |
6.45% |
There were no failures of the coliform or faecal coliform standard
at any of the service reservoirs. Differences over the last three years
in the number of service reservoirs, and in the number of tests carried
out on samples from service reservoirs, in which coliforms or faecal
coliforms were detected were not considered significant.
Water Quality in Water Supply Zones
The table below shows the data for the key parameters and any other
parameters where there was a failure of the standard. All other parameters
were fully compliant.
| Parameter |
Total
number
of tests |
Tests not meeting
the prescribed
concentration
or value |
Number of
failures
covered by
Undertakings |
Number of zones
not complying with
the standards |
|
|
No |
% |
|
|
2002 |
2001 |
2000 |
| Coliforms |
803 |
1 |
0.1 |
0 |
|
0 |
0 |
0 |
| Faecal coliforms |
803 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Colour |
115 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Turbidity |
115 |
0 |
0.0 |
0 |
|
0 |
0 |
1 |
| Odour |
115 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Taste |
115 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Hydrogen ion |
586 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Nitrate |
119 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Nitrite |
225 |
11 |
4.9 |
0 |
|
5 |
4 |
1 |
| Aluminium |
115 |
0 |
0.0 |
0 |
|
0 |
0 |
1 |
| Iron |
161 |
1 |
0.6 |
0 |
|
1 |
1 |
3 |
| Manganese |
277 |
7 |
2.5 |
3 |
|
5 |
2 |
1 |
| Lead |
72 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| PAH |
72 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Trihalomethanes |
72 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Total pesticides |
72 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| Other pesticides |
1,441 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| All others |
1,806 |
0 |
0.0 |
0 |
|
0 |
0 |
0 |
| TOTAL |
7,084 |
20 |
0.28% |
3 |
|
|
|
|
| 18 zones in 2000, 2001 and 2002 |
The fifth column indicates the number of failures in zones already
covered by legally-binding undertakings given by the Company. These
undertakings require remedial work to be carried out to ensure compliance
with the individual standard.
The New Regulations
In 2002, the Company carried out monitoring for the six new parametric
values set down in the new Water Supply (Water Quality) Regulations
2001*. These Regulations come into force on 25 December 2003. The results
are shown in the table below.
* Water Supply (Water Quality) Regulation 2000 in England
| Parameter |
Total number
of tests |
New standard |
Tests not meeting
the new standard |
| Benzene |
28 |
1.0 µg/l |
0 |
| Bromate |
77 |
10.0 µg/l |
0 |
| 1,2 dichloroethane |
28 |
3.0 µg/l |
0 |
| Nitrite (ex-water treatment
works) |
28 |
0.1 mg/l |
0 |
| Clostridium perfringens |
29 |
0/100 ml |
2 |
| Enterococci |
77 |
0/100 ml |
0 |
Compliance data for 2002 has also been analysed against the revised
standards and the results are shown in the following table.
| Parameter |
Total
number
or tests |
Current
Standard |
Number of
tests not
meeting current
standard |
Revised
Standard |
Number of
tests not
meeting revised
standard |
| Antimony |
18 |
10.0 µg/l |
0 |
5.0 µg/l |
0 |
| Arsenic |
18 |
50.0 µg/l |
0 |
10.0 µg/l |
0 |
| Boron |
18 |
2.0 mg/l |
0 |
1.0 mg/l |
0 |
| Copper |
72 |
3.0 mg/l |
0 |
2.0 mg/l |
0 |
| Lead |
72 |
50.0 µg/l |
0 |
25.0 µg/l1 |
0 |
| |
|
|
|
10.0 µg/l2 |
0 |
| Nickel |
18 |
50.0 µg/l |
0 |
20.0 µg/l |
0 |
| Nitrite (at consumers' taps) |
225 |
0.1 mg/l |
11 |
0.5 mg/l |
1 |
| PAH |
72 |
0.2 µg/l |
0 |
0.1 µg/l |
0 |
| Tetrachloroethene |
72 |
30.0 µg/l |
|
10.0 µg/l
|
0
|
| Trichloroethene |
72 |
10.0 µg/l |
Details of the new and revised standards, and the reasons for the revisions
where applicable, can be found in Chapter J "New Regulations and Associated
Programmes of Work".
1 from 25.12.03
2 from 25.12.13
Company Audit and Inspection
The Company was inspected or audited by the Inspectorate or its appointed
consultants on a number of occasions during 2002. Where relevant, report
summaries are available in the 'Business and Technical' section of the
Inspectorate's web site under 'Audit and Inspection'.
| Audit or Inspection |
Date |
| Audit of regulatory Cryptosporidium monitoring sites |
Various dates throughout the year |
| Audit of laboratory analysing for
Cryptosporidium |
January 2002 |
| Review of distribution system undertaking |
September 2002 |
| Audit of response to selected consumer complaints |
October 2002 |
| Audit of sampling arrangements |
October 2002 |
| Inspection of one water treatment works
and one service reservoir |
October 2002 |
| Audit of analytical requirements for nitrate
and nitrate |
November 2002 |
| Audit trails of five test results |
December 2002 |
| Inspection of in situ lining of mains |
December 2002 |
A number of recommendations were made in respect of action required
to avoid the risk of a breach of a regulatory duty. These recommendations
were in relation to the in situ lining of mains and the analytical requirements
for nitrite and nitrate.
Incidents
No events were notified during 2002 by the Company. For further details
on the classification of incidents, see Chapter C "Events affecting
Water Quality", in Part 3.
Enforcement Action
No enforcement action was considered for the Company as a result of
the Inspectorate activities during 2002.
Undertakings and other Improvement Programmes
Water treatment works and service reservoirs
There were no improvement programmes due for completion during 2002.
Distribution
The ongoing distribution system undertaking has been progressing satisfactorily.
During 2002, 30 km of mains have been renovated. The Company is required
to renovate a further 45 km of mains by October 2004.
Lead
The Company has a Regulation 41 Programme of work to meet the revised
standard for lead set down in the new Water Supply (Water Quality) Regulations
2000, which will come into force on 25 December 2003. Progress with
the delivery of the programme is monitored by the Inspectorate and has
been satisfactory.
|