drinking water inspectorate logo - click here to go home

Chief Inspector's Report 2002


8 Essex and Suffolk Water Plc

Overall Water Quality supplied by Essex and Suffolk Water Plc in 2002
  • A total of 120,728 tests were carried out on samples taken by Essex and Suffolk Water Plc in 2002.
  • Of these tests, 99.93% complied with the Regulations.

Essex & Suffolk-MAP

Company Information
Amount of Water Supplied: 482 Ml/d
Consumers Supplied: 1.7 million
Areas of Supply: Essex, south Norfolk and north Suffolk
Water Composition: 95% from rivers and reservoirs
  5% from boreholes and aquifers
Treatment Works: 25
Service Reservoirs: 106
Km of Mains: 8,393
Water Supply Zones: 66

Water Quality at Treatment Works, in Service Reservoirs and in Water Supply Zones

To be wholesome, water must comply with the standards for the parameters set out in the Water Supply (Water Quality) Regulations 1989. In 2002, the Company carried out a total of 120,728 tests on samples taken at water treatment works, from service reservoirs and in water supply zones and of these, 99.93% complied with the relevant water quality standards set down in the Regulations. A list of the parameters, the relevant standards and their significance can be found at the beginning of this section.

Water Quality leaving Treatment works

 
2002
2001
2000
Number of water treatment works
25
25
26
COLIFORMS
Total number of tests
4,066
4,133
4,192
- number containing coliforms
4
5
6
- % containing coliforms
0.10%
0.12%
0.14%
Treatment works with coliforms detected
3
3
4
- % of all works with coliforms detected
12.00%
12.00%
15.38%
FAECAL COLIFORMS
Total number of tests
4,066
4,133
4,192
- number containing faecal coliforms
0
1
1
- % containing faecal coliforms
0.00%
0.02%
0.02%
Treatment works with faecal coliforms detected
0
1
1
- % of all works with faecal coliforms detected
0.00%
4.00%
3.85%

Failures of the coliform standard at three works in 2002 were considered trivial or unlikely to recur as a result of remedial action taken by the Company. There were no failures of the faecal coliform standard. Differences over the last three years in the number of treatment works, and in the number of tests carried out on samples from treatment works, in which coliforms or faecal coliforms were detected were not considered significant.

In 2002, 1,392 regulatory samples for Cryptosporidium were taken at four sites. Very low numbers of oocysts were detected in two samples from two sites. All results were well below the treatment standard and there were no reported outbreaks of cryptosporidiosis.

Water Quality in Service Reservoirs

 
2002
2001
2000
Number of service reservoirs
106
104
110
COLIFORMS
Total number of tests
5,228
5,178
5,402
- number containing coliforms
10
20
43
- % containing coliforms
0.19%
0.39%
0.80%
Service reservoirs with coliforms detected
9
17
31
Service reservoirs with coliforms detected
0
0
5
in more than 5% of tests
- % of all service reservoirs with coliforms detected
0.00%
0.00%
4.55%
FAECAL COLIFORMS
Total number of tests
5,228
5,178
5,402
- number containing faecal coliforms
1
0
3
- % containing faecal coliforms
0.02%
0.00%
0.06%
Service reservoirs with faecal coliforms detected
1
0
3
- % of all service reservoirs with faecal coliforms detected
0.94%
0.00%
2.73%

There were no failures of the coliform standard at any of the service reservoirs. The detection of faecal coliforms at one service reservoir was considered trivial. There has been a significant decrease since 2000 in the number of service reservoirs, and in the number of tests carried out on samples from service reservoirs, in which total coliforms were detected. All other differences were not considered significant.

Water Quality in Water Supply Zones

The table below shows the data for the key parameters and any other parameters where there was a failure of the standard. All other parameters were fully compliant.

Parameter
Total
number
of tests
Tests not meeting
the prescribed
concentration
or value
Number of
failures
covered by
Undertakings
Number of zones
not complying with
the standards
No
%
2002
2001
2000
Coliforms
4,464
24
0.54
0
0
0
0
Faecal coliforms
4,464
3
0.07
0
3
2
2
Colour
972
0
0.00
0
0
0
0
Turbidity
559
1
0.18
0
1
0
0
Odour
538
0
0.00
0
0
0
0
Taste
538
0
0.00
0
0
0
0
Hydrogen ion
972
0
0.00
0
0
0
0
Nitrate
2,116
0
0.00
0
0
0
0
Nitrite
2,068
23
1.11
0
8
13
26
Aluminium
559
1
0.18
0
1
0
0
Iron
1,489
4
0.27
3
4
1
3
Manganese
559
1
0.18
0
1
0
1
Lead
980
2
0.20
0
2
1
1
PAH
272
1
0.37
0
1
0
1
Trihalomethanes
332
0
0.00
0
0
0
0
Total pesticides
2,058
0
0.00
0
0
0
0
Carbetamide
1,949
11
0.56
0
11
0
0
Other pesticides
65,166
0
0.00
0
0
0
0
Nickel
77
0
0.00
0
0
1
0
Total Hardness
275
1
0.36
0
1
0
1
All others
10,341
0
0.00
0
0
0
0
TOTAL
100,748
72
0.07%
3
66 zones in 2000, 2001 and 2002

The fifth column indicates the number of failures in zones already covered by legally binding undertakings given by the Company. These undertakings require remedial work to be carried out to ensure compliance with the individual standard.

The New Regulations

In 2002, the Company carried out monitoring for the six new parametric values set down in the new Water Supply (Water Quality) Regulations 2000. These Regulations come into force on 25 December 2003. The results are shown in the table below.

Parameter
Total number
of tests
New standard
Tests not meeting
the new standard
Benzene
103
1.0 µg/l
0
Bromate
248
10.0 µg/l
0
1,2 dichloroethane
103
3.0 µg/l
0
Nitrite (ex-water treatment works)
103
0.1 mg/l
0
Clostridium perfringens
70
0/100 ml
0
Enterococci
248
0/100 ml
0

Compliance data for 2002 has also been analysed against the revised standards and the results are shown in the following table.

Parameter
Total
number
or tests
Current
Standard
Number of
tests not
meeting current
standard
Revised
Standard
Number of
tests not
meeting revised
standard
Antimony
66
10.0 µg/l
0
5.0 µg/l
0
Arsenic
66
50.0 µg/l
0
10.0 µg/l
0
Boron
66
2.0 mg/l
0
1.0 mg/l
0
Copper
264
3.0 mg/l
0
2.0 mg/l
0
Lead
980
50.0 µg/l
2
25.0 µg/l1
2
 
10.0 µg/l2
22
Nickel
77
50.0 µg/l
0
20.0 µg/l
0
Nitrite (at consumers' taps)
2,068
0.1 mg/l
23
0.5 mg/l
0
PAH
272
0.2 µg/l
1
0.1 µg/l
1
Tetrachloroethene
264
30.0 µg/l
0
}
0
10.0 µg/l
0
Trichloroethene
264
10.0 µg/l

Details of the new and revised standards, and the reasons for the revisions where applicable, can be found in chapter J "New Regulations and Associated Programmes of Work".

1 From 25.12.03

2 From 25.12.13

Company Audit and Inspection

The Company was inspected or audited by the Inspectorate or its appointed consultants on a number of occasions during 2002. Where relevant, report summaries are available in the 'Business and Technical' section of the Inspectorate's web site under 'Audit and Inspection'.

Audit or Inspection Date
Inspection of Cryptosporidium monitoring sites Various dates
throughout the year
Audit of progress with regulatory programmes of work March 2002
Inspection of laboratory analysing for Cryptosporidium September 2002
Audit of response to selected consumer complaints September 2002
Review of the distribution system undertaking October 2002
Inspection of two water treatment works and two service reservoirs November 2002
Inspection of in situ lining of mains November 2002
Review of plumbosolvency treatment and control programmes for lead November 2002
Audit of analytical requirements for nitrate and nitrite November 2002
Audit trails of ten test results December 2002

A number of recommendations were made in respect of action required to avoid the risk of a breach of a regulatory duty. These recommendations were in relation to the analytical requirements for nitrate and nitrite and plumbosolvency treatment for lead.

Incidents

The Inspectorate regarded three of the events notified during 2002 by the Company as incidents. For further details on the classification of incidents, see chapter C "Events affecting Water Quality" in Part 3.

Two of the incidents have been assessed by the Inspectorate. Each was of short duration and the Company has taken appropriate remedial action. A number of recommendations were made regarding sampling and procedures.

The third incident remains under investigation.

Nature of incident
No. of
incidents
Assessment completed
Area affected

Population potentially
affected

Microbiological contamination
of supplies
2
Yes
Rainham (August)
25
   
Roxwell (September)
7
1
No
Tilbury (April)
2

Enforcement Action

No enforcement action was considered for the Company as a result of the Inspectorate's activities during 2002.

Undertakings and other Improvement Programmes

Water treatment works and service reservoirs

One Regulation 41 programme of work to meet the new and revised standards set down in the new Water Supply (Water Quality) Regulations 2000 was due for completion in 2002. This was to monitor nitrate levels at Langford and install treatment if necessary. The monitoring was completed on schedule and no treatment was necessary.

No other improvement programmes were due for completion during 2002.

Distribution

The ongoing distribution system undertaking has been progressing satisfactorily. During 2002, 56 km of mains have been renovated. The Company is required to renovate a further 774 km of mains by December 2010.

Lead

The Company has a Regulation 41 programme of work to meet the revised standard for lead set down in the new Water Supply (Water Quality) Regulations 2000, which will come into force on 25 December 2003. Progress with the delivery of the programme is monitored by the Inspectorate and has been satisfactory.


A-Z index press releases Links Site Home Contact Us search

Drinking Water Inspectorate

Ashdown House, 123 Victoria Street, London, SW1E 6DE
Telephone : 020 7944 5956


Department for Enviroment,
Food & Rural Affairs (DEFRA)

The National Assembly for Wales /
Cynulliad Cenedlaethol Cymru


Last updated July 2003

Web site terms
© Crown copyright 2002


DWI strives to ensure that the information on this website is set out in an accessible and understandable manner.
We welcome any comments about our website, including suggestions for additional topics that might be useful to our customers.