22 Three Valleys Water Plc
|
Overall water quality supplied by Three Valleys Water Plc in 2003: |
- 75,711 tests were carried out on samples taken by Three Valleys Water Plc in 2003.
- 99.89% of these tests complied with the Regulations.
|
|
|
Company Information |
Amount of Water Supplied: |
929 Ml/d |
|
Consumers Supplied: |
2.9 million |
|
Areas of Supply: |
Parts of Bedfordshire, Berkshire, |
| |
Buckinghamshire, Essex, |
| |
Hertfordshire, Surrey, Middlesex |
| |
and several London boroughs |
|
Water Composition: |
42% from rivers and reservoirs |
| |
58% from boreholes and aquifers |
|
Treatment Works: |
83 |
|
Service Reservoirs: |
137 |
|
Km of Mains: |
14,277 |
|
Water Supply Zones: |
108 |
|
|
Water quality at treatment works, in service reservoirs and in water supply zones
To be wholesome, water must comply with the water quality standards for the parameters set out in the
Water Supply (Water Quality) Regulations 1989. In 2003, the Company carried out a total of 75,711 tests
on samples of water leaving its 83 water treatment works, from its 137 service reservoirs and from
consumers’ taps in its 108 water supply zones. Of these, 99.89% (75,629) complied with the standards set
down in the Regulations. However, 0.11% (82) tests did not meet the standards. A list of the parameters,
the relevant standards and their significance can be found at the beginning of this section.
Water quality leaving treatment works
A comparison of the Company’s performance in 2003 with data for 2002 and 2001, is given below.
Differences over the last three years in the number of treatment works, and in the number of tests carried
out on samples from treatment works, in which coliforms or faecal coliforms were detected, were not
considered significant.
During 2003, the failures of the total coliform standard at four works were considered trivial, or unlikely to recur.
Two failures of the faecal coliform standard occurred at two works. These were regarded as trivial or
unlikely to recur.
In 2003, 1,658 regulatory samples for Cryptosporidium were taken at six sites. Very low numbers of
oocysts were detected in 39 samples from four sites. All results were well below the treatment standard
and there were no reported outbreaks of cryptosporidiosis.
Water quality in service reservoirs
A comparison of the Company’s performance in 2003 with data for 2002 and 2001, is given below. There
has been a significant decrease since 2002 in the number of service reservoirs in which total coliforms were
detected. All other differences were not considered significant.
During 2003, total coliforms were detected at a single service reservoir. However, there were no failures
of
the total coliform or faecal coliform standard at any service reservoir.
Water quality in water supply zones
The table below shows the data for the key parameters and any other parameters where there was a failure
of the standard. All other parameters were fully compliant. A comparison is also given for parameters failing
the standards in 2002 and 2001.
|
Parameter
|
Total number
of tests |
Tests not
meeting standard |
Number of
failures covered
by Undertakings |
Number of zones
not complying with
the standards
(number of zones in
2003 = 108)* |
|
|
|
No
|
%
|
|
2003
|
2002
|
2001
|
|
Coliforms
|
7,695
|
17
|
0.22
|
0
|
0
|
0
|
0
|
|
Faecal coliforms
|
7,695
|
2
|
0.03
|
0
|
2
|
4
|
7
|
|
Colour
|
544
|
0
|
0.00
|
0
|
0
|
0
|
0
|
|
Turbidity
|
1,640
|
0
|
0.00
|
0
|
0
|
0
|
1
|
|
Odour
|
544
|
0
|
0.00
|
0
|
0
|
0
|
0
|
|
Taste
|
544
|
0
|
0.00
|
0
|
0
|
0
|
0
|
|
Hydrogen ion
|
866
|
0
|
0.00
|
0
|
0
|
0
|
0
|
|
Nitrate
|
929
|
2
|
0.22
|
2
|
1
|
1
|
2
|
|
Nitrite
|
955
|
36
|
3.77
|
0
|
6
|
11
|
9
|
|
Aluminium
|
546
|
1
|
0.18
|
0
|
1
|
0
|
0
|
|
Iron
|
1,884
|
3
|
0.16
|
1
|
3
|
6
|
6
|
|
Manganese
|
543
|
0
|
0.00
|
0
|
0
|
0
|
0
|
|
Lead
|
454
|
1
|
0.22
|
0
|
1
|
0
|
1
|
|
PAH
|
271
|
8
|
2.95
|
0
|
5
|
7
|
3
|
|
Trihalomethanes
|
448
|
1
|
0.22
|
0
|
0
|
0
|
0
|
|
Total pesticides
|
342
|
0
|
0.00
|
0
|
0
|
0
|
0
|
|
Chlortoluron
|
223
|
1
|
0.45
|
0
|
1
|
0
|
1
|
|
Clopyralid
|
167
|
1
|
0.60
|
0
|
1
|
0
|
0
|
|
Isproturon
|
215
|
0
|
0.00
|
0
|
0
|
1
|
0
|
|
Other pesticides
|
3,885
|
0
|
0.00
|
0
|
0
|
0
|
0
|
|
Nickel
|
141
|
1
|
0.71
|
0
|
1
|
2
|
0
|
|
Oxidizability
|
122
|
1
|
0.82
|
0
|
1
|
0
|
1
|
|
Surfactants
|
119
|
0
|
0.00
|
0
|
0
|
0
|
1
|
|
All others
|
9,837
|
0
|
0.00
|
0
|
0
|
0
|
0
|
|
TOTAL
|
40,609
|
75
|
0.18
|
|
|
|
|
*110 zones in 2002 and in 2001
The fifth column indicates the number of failures in zones already covered by legally binding undertakings
given by the Company. These undertakings require remedial work to be carried out to ensure compliance
with the individual standard.
There has been a reduction in the number of zones in which the nitrite standard was exceeded. This has
been a result of operational changes to the Company’s distribution network which has improved blending in
the affected areas.
The new Regulations
In 2003, the Company carried out monitoring for the six new parametric values set down in the new Water
Supply (Water Quality) Regulations 2000. These Regulations came into force on 25 December 2003. The
results are shown in the table below.
|
Parameter
|
Total number
|
New standard
|
Tests not meeting
|
|
|
of tests
|
|
the new standard
|
|
Benzene
|
413
|
1.0µg/l |
0
|
|
Bromate
|
424
|
10.0µg/l |
1
|
|
1,2 dichloroethane
|
417
|
3.0µg/l |
0
|
|
Nitrite (exwater treatment works)
|
587
|
0.1mg/l
|
0
|
|
Clostridium perfringens
|
418
|
0/100ml
|
1
|
|
Enterococci
|
428
|
0/100ml
|
0
|
Compliance data for 2003 have also been analysed against the revised standards and the results are
shown in the following table.
|
Parameter
|
Total number
of tests |
Current
Standard |
Number of tests
not meeting
current standard
|
Revised
Standard |
Number of
tests not meeting
revised standard |
|
Antimony
|
108
|
10.0µg/l |
0
|
5.0µg/l |
0
|
Arsenic
|
108
|
50.0µg/l |
0
|
10.0µg/l |
0
|
Boron
|
108
|
2.0mg/l
|
0
|
1.0mg/l
|
0
|
Copper
|
156
|
3.0mg/l
|
0
|
2.0mg/l
|
0
|
Lead
|
455
|
50.0µg/l |
1
|
25.0µg/l |
5
|
|
|
|
|
10.0µg/l* |
13
|
Nickel
|
141
|
50.0µg/l |
1
|
20.0µg/l |
1
|
Nitrite (at consumers’ taps) |
955
|
0.1mg/l
|
36
|
0.5mg/l
|
0
|
PAH
|
271
|
0.2µg/l |
8
|
0.1µg/l |
0
|
Tetrachloroethene
Trichloroethene
|
440
440
|
10.0µg/l 30.0µg/l |
0
0
|
} 10.0µg/l
|
0
|
| * Final standard not applicable until 2013 |
During 2003, the Company had a number of programmes of work in place to meet the new standards.
Details of the new and revised standards can be found in chapter J ‘New Regulations and Associated
Programmes of Work’.
Audit and inspection
The Company was inspected or audited by the Inspectorate or its appointed consultants on a number of
occasions during 2003. Where relevant, report summaries are available in the ‘Business and Technical’
section of the Inspectorate’s website under ‘Audit and Inspection’. Details of the subject areas audited or
inspected are given in the following paragraphs:
Follow up of recommendations made during the 2002 inspections or in connection with water quality incidents
Steps have been taken to implement all of the recommendations arising from the 2002 audit and inspection
process and from assessments of water quality incidents.
Audit of regulatory Cryptosporidium monitoring sites
The monitoring equipment at all regulatory sites visited during the year was found to be satisfactory.
Inspection of laboratory analysing for Cryptosporidium
The announced audit on the Company’s Cryptosporidium
laboratory identified three regulatory breaches as
well as a number of other minor deficiencies associated with the Standard Operating Protocol. The
Company has taken the required remedial action to rectify the deficiencies identified.
Audit of progress with water treatment works improvement programmes
A desktop audit of three schemes associated with improvement programmes at water treatment works
was carried out together with one site visit. The schemes were for bromate at Essendon treatment works;
chlorinated solvents at Hart Lane/Crescent Road works; and for
Cryptosporidium at Batchworth treatment
works. Progress with all these schemes was considered satisfactory.
Review of distribution system undertaking
Progress with the programme of mains renovation set out in the Company’s continuing distribution system
undertaking was found to be generally satisfactory. However, the Company is being required to take action
on one minor matter concerning continued monitoring.
Audit of response to selected consumer complaints
A desktop audit of the Company’s response to 12 consumer complaints about drinking water quality was
found to be satisfactory.
Audit trails of selected microbiological test results
Vertical audits were carried out on two test results selected at random for the period November 2002 to
June 2003. The Company is being required to take action on deficiencies identified with transportation and
storage of a sample.
Audit trails of selected nonmicrobiological test results
Vertical audits were carried out on eight test results selected at random for the period October 2002 to July
2003. The Company is being required to take action on deficiencies identified with the method of analysis
for one parameter and also the associated instrument records. The Company and its laboratory were
commended for the high standard of work and record keeping associated with the samples audited.
Audit of analytical requirements for nitrate and nitrite
Vertical audits were carried out of nitrate and/or nitrite samples taken in a single water supply zone over a
sixmonth period to assess any changes in analytical requirements over time. The Company is being
required to take action on deficiencies identified with the level of reporting for the nitrate results.
Audit of compliance with in situ rapid set epoxy lining guidelines
Compliance with the Code of Practice for in sit
u
rapid set epoxy lining was audited at two sites in January
2003. The Company is being required to take action on deficiencies identified over the extent of delegation
to the contractor and with the post lining CCTV inspection.
Inspection of one water treatment works and three service reservoir sites
Inspections were carried out at Egham water treatment works, and at Onslow, Park Barn, Sunninghill No.1
& No.2 service reservoir sites. The operation and management of all the treatment works and service
reservoirs were satisfactory. However, the Company is being required to take action on a number of minor
deficiencies associated with manual water quality tests at Egham water treatment works, and operational
arrangements at Onslow and Sunninghill service reservoir sites.
Audit of Company policies for the supervision of contractors working on the distribution system
A desktop audit found that the Company’s policy for the supervision of contractors working on the
distribution system was satisfactory. The Company was commended for its supervisory arrangements.
Audit of Company policies for drilling and tapping activities on the distribution system
A desk top audit found that the Company’s policy for drilling and tapping activities on the distribution
system was satisfactory.
Audit of plumbosolvency treatment and control programmes
Progress with the programme of work for plumbosolvency treatment and control measures for lead was
found to be satisfactory.
Incidents
The Inspectorate regarded five events notified during 2003 as incidents. Further details of these incidents
are given in the table below.
Three of the incidents were fully investigated and assessed by the Inspectorate during 2003. Each was of relatively
short duration and, where applicable, the Company took appropriate action to protect public health. The Company
was required to take action on a small number of deficiencies identified in respect of carrying out risk assessments
and their sampling procedures. The remaining two incidents from 2003 are under consideration.
During 2003, investigations were also completed for one incident that occurred in 2002.
| Nature of incident |
Assessment completed during 2003 |
|
Discolouration of water supplies
|
|
| Discolouration of supplies to 2,000 properties in the Ickenham area during February 2003, following work to reconfigure the distribution system after a burst main. The discoloured water was caused by water backfeeding through an open valve originally thought to be in the closed position. |
Yes
|
| Discolouration of supplies to 650 properties in the Therfield area (near Royston, Herts) during February 2003 following the drain down of Therfield water tower as a result of a telemetry cable failure. |
No
|
| Discolouration of supplies to 12,000 properties in Arkley and Barnet in May 2003 following the draindown of Arkley water tower as a result of a telemetry cable failure. |
Yes
|
| Discolouration of supplies to 7,500 properties in Great Dunmow in May 2003 following a trial shutdown of a trunk main. Supply of water with an unusual odour |
Yes
|
| Supply of water with an unusual odour to 6,000 properties in Ashford, Middlesex between February and April 2003. The odour resulted from mains rehabilitation work carried out on a ten inch trunk main. |
No
|
Enforcement action
No enforcement action was considered for the Company as a result of the Inspectorate’s activities during 2003.
Improvement programmes
Water treatment works/service reservoirs
One undertaking associated with treatment works was due for completion during 2003. This was to install
treatment at Slip End treatment works to remove nitrate. The undertaking was not completed by the due
date of 25 December 2003 due to circumstances beyond the Company’s control. However, the undertaking
was completed in February 2004.
Two Regulation 41 programmes of work to meet the new and revised standards set down in the new Water
Supply (Water Quality) Regulations 2000 were due for completion in 2003. These were to install treatment
at Hart Lane and Clay Lane treatment works to remove solvents. The programmes were completed on
schedule.
Four statements of intent to reduce the risk of Cryptosporidium breaching the treatment standards were
due for completion during 2003. The programmes at Batchworth and Egham treatment works were
completed on schedule. Delays with the programmes at Mill End and West Hyde were not within the
control of the Company. New completion dates have been agreed for 30 June 2004.
No other programmes of work at water treatment works and service reservoirs were due for completion
during 2003.
Distribution
Progress for the distribution system undertaking was generally satisfactory. However, investigations showed
that much less renovation was required than anticipated. During 2003, 39 km of mains were renovated.
The Company is now required to renovate a further 237 km of mains by 31 December 2004.
Lead
The Company’s Regulation 41 programme of work to meet the revised standard for lead set down in the
new Water Supply (Water Quality) Regulations 2000 has been progressing satisfactorily. Plumbosolvency
treatment measures were installed at all sites specified in the programme by 25 December 2003.