Severn Trent Water Limited – Shelton WTW Treated Water Tanks

Notice under regulation 28(4) of the Water Supply (Water Quality) Regulations 2016 (as amended)

Reference: SVT-2026-00058

Version Number: 1

Water undertaker as appointed under section 6 of the Water Industry Act 1991 (as amended): Severn Trent Water Limited, with registered number 02366686 (hereinafter called ‘the company’).

Assets Affected:

  • T0014 – Shelton works
  • T0230 – Shelton works Oswestry Main

Details of this Notice:

  1. The Drinking Water Inspectorate (‘the Inspectorate’) has received a regulation 28(1) report of the Water Supply (Water Quality) Regulations 2016 (as amended) (‘the Regulations’) from the company dated 2 August 2024, which states that there is or has been a significant risk of supplying water from Shelton works (and associated assets as applicable) that could constitute a potential danger to human health or could be unwholesome.
  2. Consequently, this Notice is served on the company by the Inspectorate on behalf of the Secretary of State, under regulation 28(4) for the assets listed above, for risks associated with:

Description of Risk

Hazard/ Hazardous Event/ Parameter

Hazard I D

Timeliness of cleaning programme (control measure)

E. coli

T0014-328-T-H035-C002-23Q

T0230-328-T-H035-C002-23Q

Timeliness of cleaning programme (control measure)

Total coliforms

T0014-328-T-H035-C001-23P

T0230-328-T-H035-C001-23P

Timeliness of cleaning programme (control measure)

Enterococci

T0014-328-T-H035-C003-2Q2

T0230-328-T-H035-C003-2Q2

Timeliness of cleaning programme (control measure)

Colony counts

T0014-328-T-H035-C007-2C0

T0230-328-T-H035-C007-2C0

Timeliness of cleaning programme (control measure)

Clostridium perfringens

T0014-328-T-H035-C004A-2YX

T0230-328-T-H035-C004A-2YX

Table 1: Table of the hazards, hazardous events, and/or parameters covered by this Notice, including the Hazard I D numbers and the description of risks.

  1. The company are required to satisfy the following requirements.

The date given is that until or by which the requirements must be maintained or satisfied, as appropriate.

Requirements:

(a) To maintain the following measures for the period specified in each case:

  1. Operate all tanks in accordance with current company policy, standards and procedures, that align to recognised standards of good practice.
    Date: Ongoing for the duration of this Notice.
  2. Maintain proactive external site inspections, grounds maintenance, site security and asset maintenance.
    Date: Ongoing for the duration of this Notice.
  3. Carry out a remotely operated vehicle (ROV) inspection every six months.
    Date: Ongoing for the duration of this Notice.

(b) To review, revise or make operational the following measures, by the dates specified in each case:

  1. Complete enabling works in preparation for isolation of the tanks.
    Date: 31 December 2030.
  2. Isolate Shelton works Treated Water Reservoir Cell 1 East and Cell 2 West from supply.
    Date: 30 April 2031.
  3. Isolate Shelton works Water Tower Compartment A and Compartment B from supply and complete an internal inspection.
    Date: 30 June 2031.
  4. Confirm the scope and programme of works for Shelton works Water Tower Compartment A and Compartment B following inspection.
    Date: 31 August 2031.
  5. Complete any remedial works required.
    Date: 31 October 2032.

(c) To audit whether the measures have been effective by the following means:

  1. Define an audit strategy to monitor the effectiveness of the measures specified in sections (a) and (b).
    Date: 31 January 2027.
  2. Implement, and keep under continuous review, the audit strategy defined in measure (c)1.
    Date: Following completion of measure (c)1. onwards.

(d) Not to supply water for regulation 4(1) purposes from Shelton works, or not to so supply unless the specified conditions below are satisfied:

  1. Following inspection, the tank or reservoir will not be returned to service until all relevant issues which risk affecting water quality have been remediated.
    Date: Ongoing for the duration of the Notice.

(e) To provide the following information in the time and manner specified below to enable monitoring of progress towards the mitigation of the risks:

  1. Provide a progress report annually.
    Date: by 31 January each year.
  2. Submit a report confirming the completion of an ROV inspection and the findings.
    Date: Biannually by 30 June and 31 December.
  3. Provide a report confirming completion of the enabling works.
    Date: 31 January 2031.
  4. Provide a report confirming isolation of Shelton works Treated Water Reservoir Cell 1 East and Cell 2 West.
    Date: 31 May 2031.
  5. Provide a report detailing the findings of the internal inspection of Shelton works Water Tower Compartment A and Compartment B.
    Date: 31 July 2031.
  6. Provide a report detailing the scope and programme of works for Shelton works Water Tower Compartment A and Compartment B following inspection.
    Date: 30 September 2031.
  7. Provide a report confirming completion of any required remedial works.
    Date: 30 November 2032.
  8. Submit the audit strategy for auditing the effectiveness of the measures, as specified in measure (c)1.
    Date: 28 February 2027.
  9. Submit any revisions of the audit strategy produced under measure (c)2.
    Date: Within 1 month of a revision.
  10. Submit a report in the event that any completed measures of this Notice need to be altered in any way, for any reason.
    Date: Ongoing for the duration of this Notice.
  11. Submit a satisfactory completion report accompanied by a revised regulation 28(1) report with Board level Director sign-off.
    Date: 31 January 2033.

Further Details of this Notice:

  1. Any product or substance used as a result of the requirements in this Notice must comply with regulation 31.
  2. Under regulation 28(6) the Inspectorate, on behalf of the Secretary of State, may by notice served on the company, revoke or vary this Notice.
  3. Failure by the company to comply with this Notice may result in enforcement proceedings under section 18 of the Water Industry Act 1991 (as amended).
  4. Contravention of a regulation 28(4)(d) requirement is an offence under regulation 33(1). If guilty of such an offence, the company is liable on summary conviction, or on conviction on indictment, to a fine. Under regulation 33(2) it is a defence for the company to show that it took all reasonable steps and exercised all due diligence to avoid the commission of the offence.

Signed

Nicholas Adjei
Deputy Chief Inspector, on behalf of the Secretary of State for Environment, Food and Rural Affairs
13 November 2026.
Reference: SVT-2026-00058