Severn Trent Water Limited – Stroud Hill 2 Service Reservoir

Notice under regulation 28(4) of the Water Supply (Water Quality) Regulations 2016 (as amended)

Reference: SVT-2026-00060

Version Number: 1

Water undertaker as appointed under section 6 of the Water Industry Act 1991 (as amended): Severn Trent Water Limited, with registered number 02366686 (hereinafter called ‘the company’).

Assets Affected:

  • R0388 – Stroud Hill 2 Reservoir
  • YFS01 – Mitcheldean (FS01) Supply System

Details of this Notice:

  1. The Drinking Water Inspectorate (‘the Inspectorate’) has received a regulation 28(1) report of the Water Supply (Water Quality) Regulations 2016 (as amended) (‘the Regulations’) from the company dated 14 September 2026, which states that there is or has been a significant risk of supplying water from Stroud Hill 2 Reservoir (and associated assets as applicable) that could constitute a potential danger to human health or could be unwholesome.
  2. Consequently, this Notice is served on the company by the Inspectorate on behalf of the Secretary of State, under regulation 28(4) for the assets listed above, for risks associated with:

Description of Risk

Hazard/ Hazardous Event/ Parameter

Hazard I D

Timeliness of cleaning programme (control measure)

E. coli

R0388-865-S-H035-C002-23Q

Timeliness of cleaning programme (control measure)

Total coliforms

R0388-865-S-H035-C001-23P

Timeliness of cleaning programme (control measure)

Enterococci

R0388-865-S-H035-C003-2Q2

Timeliness of cleaning programme (control measure)

Colony counts

R0388-865-S-H035-C007-2C0

Timeliness of cleaning programme (control measure)

Clostridium perfringens

R0388-865-S-H035-C004A-2YX

Table 1: Table of the hazards, hazardous events, and/or parameters covered by this Notice, including the Hazard I D numbers and the description of risks.

  1. The company are required to satisfy the following requirements.

The date given is that until or by which the requirements must be maintained or satisfied, as appropriate.

Requirements:

(a) To maintain the following measures for the period specified in each case:

  1. Operate all tanks in accordance with current company policy, standards and procedures, that align to recognised standards of good practice.
    Date: Ongoing for the duration of this Notice.
  2. Maintain proactive external site inspections, grounds maintenance, site security and asset maintenance.
    Date: Ongoing for the duration of this Notice.
  3. Carry out a remotely operated vehicle (ROV) inspection every six months.
    Date: Ongoing for the duration of this Notice.

(b) To review, revise or make operational the following measures, by the dates specified in each case:

  1. Isolate Stroud Hill Tank 2 from supply and complete an internal inspection.
    Date: 30 April 2027.
  2. Confirm the scope and programme of works following inspection.
    Date: 30 June 2027.
  3. Complete any remedial works required.
    Date: 31 August 2028.

(c) To audit whether the measures have been effective by the following means:

  1. Define an audit strategy to monitor the effectiveness of the measures specified in sections (a) and (b).
    Date: 31 January 2027.
  2. Implement, and keep under continuous review, the audit strategy defined in measure (c)1.
    Date: Following completion of measure (c)1. onwards.

(d) Not to supply water for regulation 4(1) purposes from Stroud Hill 2 Reservoir, or not to so supply unless the specified conditions below are satisfied:

  1. Following inspection, the tank or reservoir will not be returned to service until all relevant issues which risk affecting water quality have been remediated.
    Date: Ongoing for the duration of the Notice.

(e) To provide the following information in the time and manner specified below to enable monitoring of progress towards the mitigation of the risks:

  1. Provide a progress report annually.
    Date: by 31 January each year.
  2. Submit a report confirming the completion of an ROV inspection and the findings.
    Date: Biannually by 30 June and 31 December.
  3. Provide a report detailing the findings of the internal inspection.
    Date: 31 May 2027.
  4. Provide a report detailing the scope and programme of works following inspection.
    Date: 31 July 2027.
  5. Provide a report confirming completion of any required remedial works.
    Date: 30 September 2028.
  6. Submit the audit strategy for auditing the effectiveness of the measures, as specified in measure (c)1.
    Date: 28 February 2027.
  7. Submit any revisions of the audit strategy produced under measure (c)2.
    Date: Within 1 month of a revision.
  8. Submit a report in the event that any completed measures of this Notice need to be altered in any way, for any reason.
    Date: Ongoing for the duration of this Notice.
  9. Submit a satisfactory completion report accompanied by a revised regulation 28(1) report with Board level Director sign-off.
    Date: 30 November 2028.

Further Details of this Notice:

  1. Any product or substance used as a result of the requirements in this Notice must comply with regulation 31.
  2. Under regulation 28(6) the Inspectorate, on behalf of the Secretary of State, may by notice served on the company, revoke or vary this Notice.
  3. Failure by the company to comply with this Notice may result in enforcement proceedings under section 18 of the Water Industry Act 1991 (as amended).
  4. Contravention of a regulation 28(4)(d) requirement is an offence under regulation 33(1). If guilty of such an offence, the company is liable on summary conviction, or on conviction on indictment, to a fine. Under regulation 33(2) it is a defence for the company to show that it took all reasonable steps and exercised all due diligence to avoid the commission of the offence.

Signed

Nicholas Adjei
Deputy Chief Inspector, on behalf of the Secretary of State for Environment, Food and Rural Affairs
13 November 2026.
Reference: SVT-2026-00060

Back to top