Severn Trent Water Limited – Service Reservoirs and Treated Water Tanks Inspections Combined

Notice under regulation 28(4) of the Water Supply (Water Quality) Regulations 2016 (as amended)

Reference: SVT-2024-00003

Version Number: 4

Water undertaker as appointed under section 6 of the Water Industry Act 1991 (as amended): Severn Trent Water Limited, with registered number 02366686 (hereinafter called ‘the Company’).

Assets Affected:

  • All the chlorine contact tanks, service reservoirs and treated water tanks (hereafter collectively referred to as ‘tanks’) used to supply water for regulation 4(1) purposes by the Company.

Details of this Notice:

  1. The Drinking Water Inspectorate (‘the Inspectorate’) has received a set of regulation 28(1) reports of the Water Supply (Water Quality) Regulations 2016 (as amended) (‘the Regulations’) from the Company dated 21 October 2021, which state that there is or has been a significant risk of supplying water from its tanks (and associated assets as applicable) that could constitute a potential danger to human health or could be unwholesome.
  2. Consequently, this Notice is served on the Company by the Inspectorate on behalf of the Secretary of State, under regulation 28(4) for the assets listed above, for risks associated with:

Description of Risk


Hazard/ Hazardous Event/ Parameter


Hazard ID


To address the potential risks of ingress and microbial re-growth.


Coliform bacteria


Multiple Hazard Lines.

For example: Hagley Road DSR R0237-594-S-H035-C001-23P


To address the potential risks of ingress and microbial re-growth.


Escherichia coli (E. coli)


Multiple Hazard Lines.

For example: Hagley Road DSR R0237-594-S-H035-C002-23Q


To address the potential risks of ingress and microbial re-growth.


Clostridium perfringens


Multiple Hazard Lines.

For example: Hagley Road DSR R0237-594-S-H035-C004A-2YX


To address the potential risks of ingress and microbial re-growth.


Enterococci


Multiple Hazard Lines.

For example: Hagley Road DSR R0237-594-S-H035-C003-2Q2


To address the potential risks of ingress and microbial re-growth.


Colony Counts


Multiple Hazard Lines.

For example: Hagley Road DSR R0237-594-S-H035-C007-2C0


To address the potential risks of ingress and microbial re-growth.


Residual Disinfectant – Total Chlorine


Multiple Hazard Lines.

For example: Hagley Road DSR R0237-594-S-H047-C010-1R3


To address the potential risks of ingress and microbial re-growth.


Residual Disinfectant – Free Chlorine


Multiple Hazard Lines.

For example: Hagley Road DSR R0237-594-S-H047-C009-161

Table 1: Table of the hazards, hazardous events, and/or parameters covered by this Notice, including the Hazard I D numbers and the description of risks.

  1. The Company are required to satisfy the following requirements.

The date given is that until or by which the requirements must be maintained or satisfied, as appropriate.

Requirements:

(a) To maintain the following measures for the period specified in each case:

  1. Operate all tanks in accordance with current company policy, standards and procedures, that align to recognised standards of good practice.
    Date: Ongoing for the duration of this notice.
  2. Carry out investigatory sampling in response to any microbiological exceedances.
    Date: Ongoing for the duration of this notice.
  3. Maintain risk based enhanced (in addition to routine regulatory sampling) sampling for any tanks listed in Annex 1 and identified as Priority 1 in Risk Based Approach. This must include, as a minimum, colony counts, E. coli, Clostridium perfringens and coliforms.
    Date: Ongoing for the duration of this notice.
  4. Maintain proactive external site inspections, grounds maintenance, site security and asset maintenance. This must include periodic inspections of hatches, seals, redundant assets, sample taps, overflows, washouts, and air valves.
    Date: Ongoing for the duration of this notice.
  5. Maintain appropriate contingency plans (including liaison with relevant stakeholders as appropriate) to protect human health.
    Date: Ongoing for the duration of this notice.
  6. Keep under review residual chlorine concentrations to ensure appropriate set points and trigger values are in place to prevent a deterioration of drinking water quality.
    Date: Ongoing for the duration of this notice.
  7. Maintain records and evidence of the identification, decision making, and completion of remedial work on all tank cells, to ensure a robust audit trail.
    Date: Ongoing for the duration of this notice.
  8. Maintain an inspection and cleaning programme for all tanks in the Company’s supply region, including the use of the flood testing methodology detailed in the audit strategy (c)1. Carry out remedial works as required.
    Date: Ongoing for the duration of this notice.
  9. Ongoing review of Risk Based Audit following implementation.
    Date: Ongoing for the duration of this notice
  10. Implement the measures identified following the critical review of the effectiveness of the Company’s scheduling and delivery of internal inspections of tanks.
    Date: Ongoing for the duration of this notice

(b) To review, revise or make operational the following measures, by the dates specified in each case:

  1. Develop a programme of works (that includes cleaning, robust ingression testing (e.g. flood/inundation), enabling works and completion of any tank remedial work required), using a risk-based approach, to carry out physical internal inspections of all tanks listed in Annex 1.
    Date: Complete
  2. Review Annex 1 on at least a biannual basis to ensure that all tanks that have not been cleaned and physically internally inspected in the last 10 years, are identified within Annex 1, unless included in a site-specific notice. Update the regulation 28(1) risk assessment as appropriate.
    Date: Biannually by 31 May and 30 November
  3. Within 3 months of the identification of a new tank requiring addition to Annex 1 (following a review completed under measure (b)2), update the programme of works (that includes cleaning, robust ingression (e.g. flood/inundation) testing and completion of any remedial work required) to include the physical internal inspections for the identified tank.
    Date: Biannually by 31 August and 28 February
  4. Complete the programme of works developed in (b)1. (Including any updates completed under measure (b)3) to completion. Maintain appropriate documentation of any remedial work completed.
    Date: 31 July 2026
  5. Develop a risk-based approach to determine the cleaning and physical internal inspection frequency of all DSR, to include as a minimum: Time since last inspected; Date of construction/age; Materials of construction/tank design; Water quality history (to include as a minimum E. coli, coliforms, and colony counts); Turnover and tank hydraulics; Points of potential ingress (hatches, seals, redundant assets, overflows, washouts, and air valves); Sample tap condition, tapping points, sample lines and material and any other risks related to individual tanks.
    Date: Complete
  6. Implement the risk-based approach to cleaning and physical internal inspections of all tanks within the company’s supply area, developed under measure (b)5.
    Date: Complete
  7. Develop and implement a risk-based approach to determine the cleaning and physical internal inspection frequency for all contact tanks and treated water storage tanks, following same criteria as DSR in (b)5.
    Date: Complete
  8. Upon the discovery of active ingress into any treated water storage assets:
    • Implement immediate short term mitigation measures to ensure public health is protected.
    • Remove the asset from supply and complete the required remedial works.
    • Where the company are unable to meet the two requirements above, devise and implement a solution to remove the asset from supply at the earliest opportunity.
      Date: Ongoing for the duration of this notice

(c) To audit whether the measures have been effective by the following means:

  1. Define an audit strategy to monitor the effectiveness of the measures specified in sections (a) and (b).
    Date: Complete
  2. Implement, and keep under continuous review, the audit strategy defined in measure (c)1.
    Date: Following completion of measure (c)1. onwards.

(d) Not to supply water for regulation 4(1) purposes from Company’s tanks, or not to so supply unless the specified conditions below are satisfied:

  1. Not Applicable.

(e) To provide the following information in the time and manner specified below to enable monitoring of progress towards the mitigation of the risks:

  1. Provide a progress report annually.
    Date: by 31 January each year.
  2. Submit the programme of work for the physical internal inspection for tanks listed in Annex 1 as required under measure (b)1.
    Date: Complete
  3. Submit a list of any newly identified tanks to be included in Annex 1, as required under measure (b)2. For any tanks listed in Annex 1, completed in advance of 31 July 2026, submit evidence demonstrating satisfactory completion of the internal inspection, ingression (e.g. inundation/flood) testing, and any remedial work completed with an accompanying regulation 28(1) report for the tank and an updated Annex 1 for this notice.
    Date: Biannually by 30 June and 31 December
  4. Submit any updated programme of works for the physical internal inspection of any tanks identified under measure (b)2.
    Date: Biannually by 30 September and 31 March
  5. Confirm completion of the programme of works for all tanks listed in Annex 1.
    Date: 31 August 2026
  6. Provide the risk-based approach for DSR inspections developed under measure (b)5. and confirm implementation of this risk-based approach to cleaning and internal inspections, as required under measure (b)6.
    Date: Complete
  7. Provide the risk-based approach for contact tank and treated water storage tank inspections and confirm implementation of this risk-based approach to cleaning and internal inspections, as required under measure (b)7.
    Date: Complete
  8. Where active ingress has been found and the company are unable to take the asset out of supply immediately, the company shall submit an action plan to detail how the company intends to mitigate the risks associated with ingress in the medium to long term.
    Date: As required for the duration of the notice, within 2 months of discovering ingress.
  9. Submit the audit strategy for auditing the effectiveness of the measures, as specified in measure (c)1.
    Date: Complete
  10. Submit any revisions of the audit strategy produced under measure (c)2.
    Date: Within 1 month of a revision
  11. Submit a report in the event that any completed measures of this Notice need to be altered in any way, for any reason.
    Date: Ongoing for the duration of this notice.
  12. Submit a satisfactory completion report accompanied by a revised regulation 28(1) report with Board level Director sign-off.
    Date: 31 August 2027

Further Details of this Notice:

  1. Any product or substance used as a result of the requirements in this Notice must comply with regulation 31.
  2. Under regulation 28(6) the Inspectorate, on behalf of the Secretary of State, may by notice served on the Company, revoke or vary this Notice.
  3. Failure by the Company to comply with this Notice may result in enforcement proceedings under section 18 of the Water Industry Act 1991 (as amended).

Signed

Nicholas Adjei
Deputy Chief Inspector, on behalf of the Secretary of State for Environment, Food and Rural Affairs
23 February 2026
Reference: SVT-2024-00003 v4

Annex 1

Table 2: Table of reservoirs that exceed the ten-year physical inspection frequency with outline programme of work.


Asset Name


Ref


Planned Isolation date


Isolation Date


Inspection Date


Return to Service Date


DOB date


AB KETTLEBY SOUTH CELL


R0735


Oct-26

 

 

 

 


BENTLEY (WARWICKSHIRE)


R0404


Feb-26

 

 

 

 


BIRCHES HEAD 1 SINGLE


R0171


Jul-26

 

 

 

 


BLORE


R0109


DoB


28/01/2025


14/02/2025


14/11/2025


14/11/2026


BOUGHTON CONTACT TANK (Chester)


T0100


Dec-25


29/01/2025

 

 

 


BOUGHTON RES A (Chester)


T0100


Jul-26


30/01/2025

 

 

 


BOUGHTON RES C (Chester)


T0100


Apr-26


31/01/2025

 

 

 


BROMSBERROW BLENDING TANK A


T0101


Jul-26


01/02/2025

 

 

 


BROMSBERROW BLENDING TANK B


T0101


Jul-26


02/02/2025

 

 

 


BURROUGH HILL


R0458


 DoB


21/10/2024


19/03/2025


19/03/2025


19/03/2026


BUSH HILL


R0265


Works Ongoing


09/05/2025


22/05/2025

 

 


BUSHBURY 2 SINGLE


R0228


Works Ongoing


23/10/2025

 

 

 


CAMPION HILLS CLEAN WATER TANK


T0123


New Addition

 

 

 

 


CHALFORD HOLDING TANK (PRE HL)


T0104


Jul-26

 

 

 

 


CHETWYND PARK SOUTH CELL B


R0114


Mar-26

 

 

 

 


CLAY LANE WTW CONTACT TANK


T0162


DoB


16/09/2024


25/09/2024


29/01/2025


29/01/2026


CLEEVE COMMON


R0343


Mar-26

 

 

 

 


CODNOR INNER CELL


R0551


Works Ongoing


02/02/2023

 

 

 


CODNOR OUTER CELL


R0551


Works Ongoing


02/02/2023

 

 

 


COLWICK 2


R0725


Works Ongoing


27/01/2025


17/02/2025

 

 


CORBAR


R0602


Works Ongoing


30/03/2023

 

 

 


COSFORD WTW OUTLET BALANCE TANK


T0075


Jul-26

 

 

 

 


COTON HAYES


R0181


Feb-26

 

 

 

 


DIDDLEBURY BALANCE TANK


T0221


Jul-26

 

 

 

 


DOCTORS HILL


R0273


DoB


25/09/2024


15/04/2025


15/04/2025


15/04/2026


EDGBASTON CELL 2


R0240


Jun-26

 

 

 

 


EDGE HILL TOWER EAST


R0683


DoB


25/05/2023


18/02/2025


18/02/2025


18/02/2026


EDGE HILL TOWER WEST


R0683


 DoB


25/05/2023


18/02/2025


18/02/2025


18/02/2026


FRANKLEY 3RD CONTACT TANK CELL 1


T0082


New Addition

 

 

 

 


FRANKLEY 3RD CONTACT TANK CELL 2


T0082


New Addition

 

 

 

 


GILROES DSR


R0466


DoB


21/03/2023


15/05/2023


17/11/2025


17/11/2026


GOLDEN HILL 2 (NOTTS) SINGLE


R0733


DoB


12/02/2025


27/02/2025


13/08/2025


13/08/2026


GOLDENHILL 1 MIDDLE CELL (2)


R0187


Works Ongoing


28/03/2025


23/04/2025

 

 


GOLDENHILL 1 SOUTH CELL (1)


R0187


Works Ongoing


28/03/2025


22/04/2025

 

 


HAGLEY ROAD EAST CELL


R0237


Jul-26

 

 

 

 


HAGLEY ROAD WEST CELL


R0237


Jul-26

 

 

 

 


HAMPTON TOWER


R0423


Works Ongoing


13/09/2023


25/07/2024

 

 


HARTHILL 2 CELL B


R0674


 DoB


30/10/2024


05/03/2025


05/03/2025


05/03/2026


HEADLESS CROSS


R0286


Works Ongoing


19/03/2025


10/04/2025

 

 


HEADLESS CROSS OLD WEST


R0691


Jul-26

 

 

 

 


HEWLETTS DSR 2


R0354


Works Ongoing


11/10/2021


26/10/2021

 

 


HILTON OUTLET BALANCE TANK


T0077


Jul-26

 

 

 

 


HULLAND NEW DSR 1


R0566


Works Ongoing


30/09/2025

 

 

 


KINNERLEY HL BALANCE TANK 1


T0007


Jul-26

 

 

 

 


KINSALL BALANCING TANK


T0008


Jul-26

 

 

 

 


LADYWASH SOUTH CELL


R0622


May-26

 

 

 

 


LOW SERVICE DSR INNER


R0571


DoB


20/03/2023


24/04/2025


24/04/2025


24/04/2026


LYE GREEN WATER TOWER


R0431


Works Ongoing


13/11/2022

 

 

 


MARDY TREATED WATER RESERVOIR


T0011


Jul-26

 

 

 

 


MARTINSIDE


R0628


Works Ongoing


29/10/2025

 

 

 


MEIR HEATH TOWER


R0200


Works Ongoing


24/02/2021

 

 

 


MEIR WATERHEAD CELL 1


R0727


Jul-26

 

 

 

 


MEIR WATERHEAD CELL 2


R0727


Jul-26

 

 

 

 


MEIR WATERHEAD CELL 3


R0727


DoB


10/04/2025


12/05/2025


20/11/2025


20/11/2026


MEIR WATERHEAD CELL 4


R0727


Jul-26

 

 

 

 


MITCHELDEAN WTW TREATED WATER RESERVOIR


T0110


Jul-26

 

 

 

 


MOUNT PLEASANT EAST CELL


R0664


DoB


21/10/2024


06/11/2024


01/08/2025


01/08/2026


NEDGE HILL EAST CELL


R0141


Jul-26

 

 

 

 


NYMPSFIELD


R0371


Works Ongoing


25/11/2025

 

 

 


OADBY 1


R0482


Feb-26

 

 

 

 


OADBY 2


R0483


DoB


11/10/2023


15/05/2025


15/05/2025


15/05/2026


OAKLEY FARM BALANCE TANK MANUAL


T0027


Jul-26

 

 

 

 


OGSTON BALANCE TANK (NEW) CELL NO.1


T0193


DoB


09/12/2024


18/01/2025


18/01/2025


17/01/2026


OGSTON BALANCE TANK (NEW) CELL NO.2


T0193


DoB


09/12/2024


18/01/2025


18/01/2025


17/01/2026


OLD PARK CELL 2


R0146


Jul-26

 

 

 

 


OSWESTRY LOW LEVEL (CELL 2)


R0732


 DoB


09/09/2025


17/09/2025


02/10/2025


02/10/2026


PENTRE I&M BALANCING TANK


T0222


Jul-26

 

 

 

 


PIM HILL 1 NORTH CELL


R0082


DoB


22/10/2024


15/05/2025


15/05/2025


15/05/2026


PIM HILL 1 SOUTH CELL


R0082


DoB


22/10/2024


15/05/2025


15/05/2025


15/05/2026


RADBOURNE DSR 1


R0681


Jul-26

 

 

 

 


RADBOURNE DSR 2


R0681


Jul-26

 

 

 

 


RAMSDALE 1 EAST CELL


R0516


Jul-26

 

 

 

 


RAMSDALE 1 WEST CELL


R0516


Jul-26

 

 

 

 


RUYTON XI TOWNS FINAL BALANCING TANK


T0013


Jul-26

 

 

 

 


SCADDOWS CELL 1


R0582


Mar-26

 

 

 

 


SCADDOWS CELL 2


R0582


Mar-26

 

 

 

 


SEVERN STOKE DSR


R0317


Works Ongoing


04/07/2022

 

 

 


SHELTON WTW TREATED WATER RESERVOIR – CELL 1 – EAST


T0014


Jul-26

 

 

 

 


SHELTON WTW TREATED WATER RESERVOIR – CELL 2 – WEST


T0014


Jul-26

 

 

 

 


SHELTON WTW WATER TOWER COMPARTMENT A


T0014


Jul-26

 

 

 

 


SHELTON WTW WATER TOWER COMPARTMENT B


T0014


Jul-26

 

 

 

 


STAUNTON 2 CELL A


R0386


DoB


07/11/2023


07/12/2023


28/08/2025


28/08/2026


STONY HOUGHTON 1


R0535


Jul-26

 

 

 

 


STONY HOUGHTON 5


R0535


Jul-26

 

 

 

 


STROUD HILL 2


R0388


Jul-26

 

 

 

 


TEAN BALANCE TANK 1


T0178


Jul-26

 

 

 

 


TEAN BALANCE TANK 2


T0178


Jul-26

 

 

 

 


TITTESWORTH WTW CONTACT TANK COMP B (EAST)


T0067


Works Ongoing


11/11/2024

 

 

 


WASHINGSTOCKS OUTLET BALANCE TANK (OLD CT)


T0094

Jul-26

 

 

 

 


WESTRIP CELL A


R0393

Works Ongoing

11/03/2025

16/04/2025

 

 


WESTRIP CELL B


R0393

DoB

29/02/2024

07/03/2025

07/03/2025

07/03/2026


WHITCLIFFE COMMON


R0121


Works Ongoing


24/02/2023

 

 

 


WHITECOURT


R0394


May-26

 

 

 

 


WILDMOOR OUTLET BALANCE TANK (OLD CT)


T0098


Jul-26

 

 

 

 


WOLDS CELL A2


R0646


Works Ongoing


29/12/2025

 

 

 


YEW TREE HILL DSR 2


R0329


Works Ongoing


07/12/2021

 

 

 


YEW TREE HILL TOWER


R0330


Works Ongoing


22/08/2024

 

 

 