Southern Water Services Limited – Ground Water Treatment Works HazRev Delayed Actions

Notice under regulation 28(4) of the Water Supply (Water Quality) Regulations 2016 (as amended)

Reference: SRN-2025-00008

Version Number: 1

Water undertaker as appointed under section 6 of the Water Industry Act 1991 (as amended): Southern Water Services Limited, with registered number 02366670 (hereinafter called ‘the Company’).

Assets Affected:


Asset Name


Reference


Angmering WSW


TS018


Balsdean WSW


TS036


Bottom Pond WSW


TK021


Bush Road Cuxton WSW


TK002


Calbourne WSW


TI005


Clapham WSW


TS019


Easton WSW


TH007


Falmer WSW


TS037


Findon Road WSW


TS021


Flemings WSW


TK024


Higham WSW


TK007


Ibthorpe WSW


TH013


Knighton WSW


TI009


London Road WSW


TK018


Lower Bush Cuxton WSW


TK039


Martin Mill WSW


TK027


Newmarket Lewes B WSW


TS044


Newmarket Lewes C WSW


TS039


Northfleet WSW


TK014

Overton WSW


TH016


Patching WSW


TS020


River Way Andover WSW


TH010


Rotherfield WSW


TS006


Selling WSW


TK041


Southover WSW


TS040


Sparrow Castle WSW


TK032


Stanhope Lodge WSW


TS022


Steyning WSW


TS008


Timsbury WSW


TH004


Twyford WSW


TH005

Table 1: List of assets affected and associated reference numbers

Details of this Notice:

  1. The Drinking Water Inspectorate (‘the Inspectorate’) has received a regulation 28(1) report of the Water Supply (Water Quality) Regulations 2016 (as amended) (‘the Regulations’) from the Company dated 17 October 2019, which states that there is or has been a significant risk of supplying water from Ground Water Treatment Works (and associated assets as applicable) that could constitute a potential danger to human health or could be unwholesome.
  2. Consequently, this Notice is served on the Company by the Inspectorate on behalf of the Secretary of State, under regulation 28(4) for the assets listed above, for risks associated with:

Description of Risk


Hazard/ Hazardous Event/ Parameter


Hazard I D


Pathogenic bacteria ingress route and failure of treatment process


E. coli


For example: 43790


Pathogenic bacteria ingress route and failure of treatment process


Enterococci


For example: 43791


Pathogenic Protozoa breakthrough presenting risk to public health


For Example: Cryptosporidium


For example: 43786


Increasing nitrate in source waters


Nitrate


For example: 43811


Insufficient water supply to downstream consumers


No Supply


For example: 43845, 43846, 43847


Failure of treatment poses risk to wholesomeness


Lead


For example: 43822


Failure of treatment poses risk to wholesomeness


Hydrocarbons e.g. PAH


For example: 43839


Discolouration in downstream network


For example: Manganese, Iron


For example: 43829, 43828


Failure of treatment poses risk to wholesomeness


Other chemical public health


For example: 43844


Compromised disinfection process


Turbidity


For example: 70083


Treatment by-products


Tetrachloromethane


For example: 43832

Failure of treatment poses risk to wholesomeness

Pesticides (e.g. Aldrin)

For example: 43806


Failure of treatment poses risk to wholesomeness


Taste


For example: 43837


Failure of treatment poses risk to wholesomeness


Odour


For example: 43838

Table 2: Table of the hazards, hazardous events, and/or parameters covered by this Notice, including the Hazard I D numbers and the description of risks.
  1. The Company are required to satisfy the following requirements.

The date given is that until or by which the requirements must be maintained or satisfied, as appropriate.

Requirements:

(a) To maintain the following measures for the period specified in each case:

  1. Ensure all water quality related, scheduled operational and maintenance tasks are carried out at the current prescribed schedule.
    Date: Ongoing for the duration of this Notice
  2. Ensure that any new risk identified is assessed in accordance with the drinking water safety plan methodology.
    Date: Ongoing for the duration of this Notice
  3. Ensure that treatment works start-up protocols are followed when restarting each site.
    Date: Ongoing for the duration of this Notice
  4. Ensure that the existing site-specific disinfection policies are annually reviewed and kept up to date with existing alarm and shutdown levels.
    Date: Ongoing for the duration of this Notice
  5. Ensure the treatment works control and shutdown systems are operational and that all monitors are calibrated at the predefined frequencies.
    Date: Ongoing for the duration of this Notice
  6. Continue to track borehole headworks condition and risk via the borehole headworks database and drinking water safety plan.
    Date: Ongoing for the duration of this Notice
  7. Use site specific procedures where appropriate, including manual intervention or run to waste.
    Date: Ongoing for the duration of this Notice
  8. Issue advice to consumers, where required, of improperly disinfected water.
    Date: Ongoing for the duration of this Notice
  9. Provide bi-monthly updates at transformation meetings on progress of actions to include predicted float, actions completed to date and any major changes in delivery.
    Date: Ongoing for the duration of this Notice

(b) To review, revise or make operational the following measures, by the dates specified in each case:

  1. Carry out mitigation of regulatory risk statements as identified in Appendices:
    a) Completion and commissioning of the actions in Appendix A– Phase 1 2026.
    Date: 30 June 2026
    b) Completion and commissioning of the actions in Appendix B – Phase 2 2026.
    Date: 31 December 2026

(c) To audit whether the measures have been effective by the following means:

  1. Define an audit strategy to monitor the effectiveness of the measures specified in sections (a) and (b).
    Date: 31 August 2025
  2. Implement, and keep under continuous review, the audit strategy defined in measure (c)1.
    Date: Following completion of measure (c)1. onwards.

(d) Not to supply water for regulation 4(1) purposes from Groundwater treatment works, or not to so supply unless the specified conditions below are satisfied:

  1. Not Applicable

(e) To provide the following information in the time and manner specified below to enable monitoring of progress towards the mitigation of the risks:

  1. Provide a progress report annually.
    Date: by 31 January each year.
  2. Provide a report confirming completion and commissioning of all Phase 1 2026 actions.
    Date: 31 July 2026
  3. Provide a report confirming completion and commissioning of all Phase 2 2026 actions.
    Date: 31 January 2027
  4. Submit the audit strategy for auditing the effectiveness of the measures, as specified in measure (c)1.
    Date: 30 September 2025
  5. Submit any revisions of the audit strategy produced under measure (c)2.
    Date: Within 1 month of a revision
  6. Submit a report in the event that any completed measures of this Notice need to be altered in any way, for any reason.
    Date: Ongoing for the duration of this Notice
  7. Submit a satisfactory completion report accompanied by a revised regulation 28(1) report with Board level Director sign-off.
    Date: 31 January 2028

Further Details of this Notice:

  1. Any product or substance used as a result of the requirements in this Notice must comply with regulation 31.
  2. Under regulation 28(6) the Inspectorate, on behalf of the Secretary of State, may by notice served on the Company, revoke or vary this Notice.
  3. Failure by the Company to comply with this Notice may result in enforcement proceedings under section 18 of the Water Industry Act 1991 (as amended).

Signed

 Nick Adjei
Deputy Chief Inspector, on behalf of the Secretary of State for Environment, Food and Rural Affairs
31 July 2025
Reference: SRN-2025-00008 v1

Appendix A – Phase 1 2026


Unique ID


Site


Step Details


Complete and Commissioning Date

SW0017-1

Angmering WSW

Angmering WSW – UV bypass

31-Dec-25

SW0017-2

Angmering WSW

Angmering WSW – UV bypass

31-Dec-25

SE0153

Southover WSW

Southover WSW – PLC Replacement

04-Jan-26

KT0162-1

Sparrow Castle WSW

Sparrow Castle WSW – Headworks

04-Jan-26

SN0053

Rotherfield WSW

Rotherfield WSW – Obsolete PLC

31-Jan-26

SE0008

Balsdean WSW

Balsdean WSW Dead Legs

31-Jan-26

SE-Fal007

Falmer WSW

Falmer WSW – GAC deadleg

31-Jan-26

SN-STY-001

Steyning WSW

Steyning – Well 1, ingress risk

31-Jan-26

KM0027

Bottom Pond WSW

Bottom Pond WSW – Compliance sample tap

31-Jan-26

HS0054

Easton WSW

Easton WSW – BH1 panel

28-Feb-26

HS0054-b

Easton WSW

Easton WSW – Old Well and BH1 panel

28-Feb-26

SW_FIN001

Findon Road WSW

Findon Road WSW – Site PLC

28-Feb-26

KT0014

Fleming WSW

Fleming WSW – Run to waste

28-Feb-26

KT0014-1

Fleming WSW

Fleming WSW – Run to waste

28-Feb-26

KM0070

Higham WSW

Higham WSW – Obsolete chlorination system

28-Feb-26

KM-NOR001

Northfleet WSW

Northfleet WSW – Final sampling

31-Mar-26

HN0074

Overton WSW

Overton WSW – Borehole condition

31-Mar-26

SN0059

Steyning WSW

Steyning WSW – BH turbidity

31-Mar-26

KM-LBC003

Lower Bush Cuxton WSW

Lower Bush Cuxton WSW – Borehole Headworks conditions

31-May-26

IW0131

Calbourne WSW

Calbourne WSW – Well headworks condition

03-Jun-26

SW0040

Clapham WSW

Clapham WSW – run to waste

30-Jun-26

SE0088-1

Newmarket Lewes B WSW

Newmarket Lewes B WSW – Borehole B

30-Jun-26

SE0088-2

Newmarket Lewes B

Newmarket Lewes B – Borehole B

30-Jun-26

KM0127-1

Northfleet WSW

Northfleet WSW – (Chalk) Borehole 1

30-Jun-26

SW0064-2

Stanhope Lodge WSW

Stanhope Lodge WSW – Start-up turbidity

30-Jun-26

SW0064-3

Stanhope Lodge WSW

Stanhope Lodge WSW – Start-up turbidity

30-Jun-26

SN0051

Rotherfield WSW

Rotherfield WSW – Flooded chamber

30-Jun-26

 

Appendix B – Phase 2 2026

Unique ID

Site

Step Details

Complete and Commissioning Date

KT0162-2

Sparrow Castle WSW

Sparrow Castle WSW – Headworks

04-Jul-26

KM0299

Bush Road Cuxton WSW

Bush Road Cuxton WSW – BH sanitary seal

31-Jul-26

HN0025-3

Overton WSW

Overton WSW – Run to Waste

05-Aug-26

KM0043

Bush Road Cuxton WSW

Bush Road Cuxton WSW – No Run to Waste

05-Sep-26

SE0203

Newmarket Lewes C WSW

Newmarket Lewes C WSW – Ortho dosing

30-Sep-26

IW0167-1

Calbourne WSW

Calbourne WSW – On site hydrocarbons

30-Sep-26

HS0134

Easton WSW

Easton WSW – BH1 and BH2 tests

30-Sep-26

SW-PTG001-2

Patching WSW

Patching WSW – BH3 sanitary seal

30-Sep-26

KT0150

Selling WSW

Selling WSW – Run to Waste

30-Sep-26

KT0150-1

Selling WSW

Selling WSW – Run to Waste

30-Sep-26

SE0161

Southover WSW

Southover WSW – Lewes Valley Radio Network

30-Sep-26

HS0077

Twyford WSW

Twyford WSW – Well 1&2 new floor plates

30-Sep-26

SE0016c

Falmer WSW

Falmer WSW – GAC regeneration and return to service

30-Sep-26

SE0202-1

Newmarket C&D WSW

Newmarket C&D WSW – Newmarket C boreholes

30-Sep-26

SE0202-2

Newmarket C&D WSW

Newmarket C&D WSW – Newmarket C boreholes

30-Sep-26

HN0081

Ibthorpe WSW

Ibthorpe WSW – Contact main air release valves

30-Sep-26

HN0015-2

Ibthorpe WSW

Ibthorpe WSW – DO Constraint

30-Sep-26

KT0013-2

Flemings WSW

Flemings WSW – Contact main sediments

30-Sep-26

KT0013-3

Flemings WSW

Flemings WSW – Contact main sediments

30-Sep-26

HS0061

Timsbury WSW

Timsbury WSW- No Run- to- Waste

30-Sep-26

KM0127

Northfleet WSW

Northfleet WSW – (Chalk) Borehole 2

30-Sep-26

HS0056-3

Easton WSW

Easton WSW – Diesel tank bund

31-Oct-26

IW0123

Knighton WSW

Knighton WSW – Bisulphite tanks

31-Oct-26

KT0030-2

Martin Mill WSW

Martin Mill WSW – Weir Arrangement

31-Oct-26

KT0030-1

Martin Mill WSW

Martin Mill WSW – Weir Arrangement

31-Oct-26

KT0030-3

Martin Mills WSW

Martin Mills WSW – Contact Tank Bypass

31-Oct-26

KT-MaMi001

Martin Mill WSW

Martin Mill WSW – Contact Tank Bypass

31-Oct-26

KT0027

Martin Mill WSW

Martin Mill WSW – No Run to Waste

31-Oct-26

HN0001-1

River Way Andover WSW

River Way Andover WSW – GAC control and operation

30-Nov-26

HN0001-3

River Way Andover WSW

River Way Andover WSW – GAC control and operation

30-Nov-26

SENew014

Southover SWS

Southover SWS – Final RTW

30-Nov-26

IW0025

Calbourne WSW

Calbourne WSW – No raw run to water

22-Dec-26

KM0273

London Road WSW

London Road WSW – No run to waste

31-Dec-26

SE0155-1

Southover WSW

Southover WSW – Orthophosphoric acid deliver

31-Dec-26

Back to top