Thames Water Utilities Limited – Multiple Sites Verification of Disinfection
Notice under regulation 28(4) of the Water Supply (Water Quality) Regulations 2016 (as amended)
Reference: TMS-2025-00003
Version Number: 1
Water undertaker as appointed under section 6 of the Water Industry Act 1991 (as amended): Thames Water Utilities Limited, with registered number 02366661 (hereinafter called ‘the company’).
Assets Affected:
- Multiple works listed in Annex 1.
Details of this Notice:
- The Drinking Water Inspectorate (‘the Inspectorate’) has received various regulation 28(1) reports of the Water Supply (Water Quality) Regulations 2016 (as amended) (‘the Regulations’) from the company which state that there is, or has been a significant risk of supplying water from multiple sites (see Annex 1) (and associated assets as applicable) that could constitute a potential danger to human health or could be unwholesome.
- Consequently, this Notice is served on the company by the Inspectorate on behalf of the Secretary of State, under regulation 28(4) for the assets listed above, for risks associated with:
|
Description of Risk |
Hazard/ Hazardous Event/ Parameter |
Hazard I D |
|---|---|---|
|
Inability to verify disinfection. |
C001 – Total Coliforms (confirmed) | Multiple hazard lines, for example: West Wickham TMS-4-T01U.179-MDCT004-T01U.179-C001 |
|
Inability to verify disinfection. |
C002 – E. coli (confirmed) | Multiple hazard lines, for example: West Wickham TMS-4-T01U.179-MDCT005-T01U.179-C002 |
|
Inability to verify disinfection. |
C003 – Enterococci (confirmed) | Multiple hazard lines, for example: West Wickham TMS-4-T01U.179-MDCT006-T01U.179-C003 |
- The company are required to satisfy the following requirements.
The date given is that until or by which the requirements must be maintained or satisfied, as appropriate.
Requirements:
(a) To maintain the following measures for the period specified in each case:
- Operation of all processes within defined operating ranges with appropriate triggers, responses, and contingency procedures.
Date: Ongoing for the duration of this Notice - Continuous monitoring of raw and treated water with control systems, alarmed operating limits and automatic shutdown as appropriate.
Date: Ongoing for the duration of this Notice - Continue to implement company water quality response procedures for investigation of contraventions including process optimisation and reporting; consumer complaints procedures; event response procedures for event actions; and notification criteria.
Date: Ongoing for the duration of this Notice - Continue to implement the company’s Site Operating Manuals (SOMs), defining normal operating ranges, triggers, response, and contingency procedures, with controlled updates and review programmes. Implement the company’s Internal Waiver Process, where a deviation from the SOM is identified.
Date: Ongoing for the duration of this Notice - Ensure that the Site-Specific Disinfection Policies remain up-to-date and implemented.
Date: Ongoing for the duration of this Notice - Maintain contingency plans to protect human health in the event of a risk associated with drinking water quality, which should include liaison with local authorities and UKHSA to agree any actions needed to protect human health and issuing of advice to consumers, where required.
Date: Ongoing for the duration of this Notice
(b) To review, revise or make operational the following measures, by the dates specified in each case:
- Conduct a comprehensive study to identify the technical, operational, and regulatory requirements for verifying disinfection at sites listed in Annex 1. To Include as a minimum:
- Review existing disinfection infrastructure and monitoring capabilities.
- Identify gaps in disinfection verification.
- Assess site-specific constraints.
Date: 30 April 2026
- Following (b)1, develop a phased programme of work to ensure that disinfection can be continuously verified at sites listed in Annex 1.
- Produce a technical report summarising verification requirements per site.
- Produce a risk-based prioritisation delivery matrix.
Date: 28 February 2027
- Complete Phase 1: Higher-risk sites as shown in Annex 1, Table 1 of this notice.
Date: 31 March 2028
- Complete Phase 2: Medium-risk sites as shown in Annex 1, Table 2 of this notice.
Date: 31 March 2029
5. Complete Phase 3: Lower-risk sites as shown in Annex 1, Table 3 of this notice.
Date: 31 March 2030
(c) To audit whether the measures have been effective by the following means:
- Define an audit strategy to monitor the effectiveness of the measures specified in sections (a) and (b).
Date: 31 December 2025 - Implement, and keep under continuous review, the audit strategy defined in measure (c)1.
Date: Following completion of measure (c)1. onwards.
(d) Not to supply water for regulation 4(1) purposes from multiple sites listed within Annex 1, or not to so supply unless the specified conditions below are satisfied:
- Not applicable.
(e) To provide the following information in the time and manner specified below to enable monitoring of progress towards the mitigation of the risks:
- Provide a progress report annually.
Date: by 31 January each year. - Confirm completion of the study to identify the requirements of sites in Annex 1, as specified under measure (b)1.
Date: 31 May 2026 - Submit the programme of work for the sites listed in Annex 1 as required under measure (b)2.
Date: 31 March 2027 - Provide reports detailing the completion of the Phase 1 sites as shown in Annex 1, Table 1 of this notice, as per the requirement of (b)3.
Date: 30 April 2028 - Provide reports detailing the completion of the Phase 2 sites as shown in Annex 1, Table 2 of this notice, as per the requirement of (b)4.
Date: 30 April 2029 - Provide reports detailing the completion of the Phase 3 sites as shown in Annex 1, Table 3 of this notice, as per the requirement of (b)5.
Date: 30 April 2030 - Submit the audit strategy for auditing the effectiveness of the measures, as specified in measure (c)1.
Date: 31 January 2026 - Submit any revisions of the audit strategy produced under measure (c)2.
Date: Within 1 month of a revision - Submit a report in the event that any completed measures of this Notice need to be altered in any way, for any reason.
Date: Ongoing for the duration of this Notice - Submit a satisfactory completion report accompanied by a revised regulation 28(1) report with Board level Director sign-off.
Date: 30 April 31
Further Details of this Notice:
- Any product or substance used as a result of the requirements in this Notice must comply with regulation 31.
- Under regulation 28(6) the Inspectorate, on behalf of the Secretary of State, may by notice served on the company, revoke or vary this Notice.
- Failure by the company to comply with this Notice may result in enforcement proceedings under section 18 of the Water Industry Act 1991 (as amended).
Signed
Nicholas Adjei
Deputy Chief Inspector, on behalf of the Secretary of State for Environment, Food and Rural Affairs
23 October 2025
Reference: TMS-2025-00003 v1
Annex 1 TMS-2025-00003 v1: Affected Assets and their Associated Risk Assessment References
Table 1: A list of higher risk assets affected alongside the associated risk assessment records and supply systems.
Asset Name | Asset Code | Associated Supply System and Reference Number |
Completion Date |
|
West Wickham works |
T01U.179 | YTMS1167 Addington Supply System YTMS1192 Farnborough Supply System YTMS1206 Knockholt Supply System YTMS1231 Westerham Supply System YTMS3000 Bromley Common, Bromley Inset (SSE) (TW Community; Farnborough) | |
|
Playhatch works |
T06U.628 | YTMS1217 Reading Supply System | |
|
Ashton Keynes works |
T07U.722 | YTMS1169 Ashton Keynes Supply System YTMS1225 Swindon North Supply System YTMS2003 Ashton Keynes Community | |
|
Millmead works |
T04U.404 | YTMS1195 Guildford Supply System | |
|
Watlington works |
T05U.509 | YTMS1179 Chinnor Supply System | |
|
T01U.129 | YTMS1193 Farningham Hill Supply System YTMS1222 Southfleet Supply System YTMS3015 Kent Wells (IWNL), Kent Wells (IWNL) (TW Supply system: Multiple) YTMS3021 Southfleet Community | ||
|
Marlow works |
T03U.336 | YTMS1235 Wycombe Supply System | |
|
Orpington works |
T01U.140 | YTMS1192 Farnborough Supply System YTMS1206 Knockholt Supply System YTMS1231 Westerham Supply System YTMS3000 Bromley Common, Bromley Inset (SSE) (TW Community; Farnborough) | |
|
Clatford works |
T07U.713 | YTMS1208 Marlborough Supply System | |
|
Ashdown Park works |
T07U.723 | YTMS1168 Ashbury Supply System YTMS 1211 Newbury Supply System | |
|
Crayford works |
T01U.107 | YTMS1210 New Cross and Riverside Community YTMS1215 Oxleas Wood Community YTMS3004 The Bridge, Eltham Community YTMS3005 Heart of East Greenwich Inset Community – Subset of Hampton 30/36 Community YTMS3008 Greenwich Millennium Village Inset (IWNL) (TW Community: Hampton 30/36) YTMS3021 Kent Wells (IWNL), (TW Supply system: Multiple) |
Table 2: A list of medium assets affected alongside the associated risk assessment records and supply systems.
Asset Name | Asset Code | Associated Supply System and Reference Number | Completion Date |
|
Enborne Grange works |
T06U.632 | YTMS1211 Newbury Supply System YTMS2002 Newbury Community | |
|
Axford works |
T07U.721 | YTMS1208 Marlborough Supply System YTMS1225 Swindon North Supply System YTMS1226 Swindon South Supply System | |
|
Speen works |
T06U.613 | YTMS1211 Newbury Supply System YTMS2002 Newbury Community | |
Wantage Manor Road works | T06U.601 | YTMS1230 Wantage Supply System | |
|
Seven Springs works |
T07U.705 | YTMS1181 North Cotswolds Community YTMS1212 North Cotswolds Supply system YTMS3011 Rissington Inset (Albion) (TW Community: North Cotswolds) | |
|
Lullingstone works |
T01U.133 | YTMS1176 Chelsfield Supply System | |
|
Bishops’ Green works |
T06U.615 | YTMS 1211 Newbury Supply System YTMS1217 Reading Supply System | |
|
Hungerford works |
T06U.603 | YTMS1204 Hungerford Supply System | |
|
Sundridge Works |
T01U.160 | YTMS1206 Knockholt Supply System YTMS1231 Westerham Supply System | |
|
Brantwood works |
T01U.170 | YTMS1167 Addington Supply System YTMS1218 Russell Hill Supply System YTMS3001 New South Quarter, Addington Community |
Table 3: A list of lower risk assets affected alongside the associated risk assessment records and supply systems.
Asset Name | Asset Code | Associated Supply System and Reference Number | Completion Date |
Bedwyn works | T07U.719 | YTMS1204 Hungerford Supply System | |
Bibury works |
T07U.718 |
YTMS1181 North Cotswolds Community YTMS1212 North Cotswolds Supply system YTMS3011 Rissington Inset (Albion) (TW Community: North Cotswolds) | |
Bradfield Works |
T06U.620 | YTMS1211 Newbury Supply System YTMS1217 Reading Supply System | |
Childrey Warren Works | T06U.602 | YTMS1230 Wantage Supply System | |
Dancers End Works | T05U.503 | YTMS1229 Tring Supply System | |
Greys Road Henley Works | T06U.626 | YTMS1200 Henley Supply System | |
Hampden Bottom Works |
T05U.504 | YTMS1170 Aylesbury Supply System YTMS2001 Aylesbury Community YTMS3014 Aylesbury Supply System | |
Harpsden Works | T06U.627 | YTMS1200 Henley Supply System | |
Haslemere Works | T04U.403 | YTMS1232 Witley, Chiddingfold and Dunsfold Supply System | |
Hawridge Works |
T05U.505 | YTMS1170 Aylesbury Supply System YTMS1229 Tring Supply System YTMS2001 Aylesbury Community | |
Leckham-pstead Works |
T06U.633 | YTMS1184 Compton Supply System | |
|
Marlborough Works |
T07U.708 | YTMS1208 Marlborough Supply System | |
|
Mousehill/ Rodborough Works |
T04U.402 | YTMS1232 Witley, Chiddingfold and Dunsfold Supply System | |
Pangbourne Works | T06U.630 | YTMS1217 Reading Supply System | |
Ramsbury Works | T07U.706 | YTMS1208 Marlborough Supply System | |
Syreford Works | T07U.703 | YTMS1212 North Cotswolds Supply system | |
Witheridge Hill Works | T06U.625 | YTMS1182 Cleeve Supply System | |
Woods Farm Works | T06U.619 | YTMS1223 Streatley Supply System |